1. The building formwork should be carried out in accordance with the provisions of the design of the matching plate, and follow the support first and then dismantle. When removing the mold, it is strictly forbidden to use a sledgehammer and a crowbar to smash and pry hard.
2. Remove the side mold first, and then remove the load-bearing mold.
3. The combined large formwork should be removed as a whole.
4. The supporting parts and connecting parts should be disassembled piece by piece, the formwork should be dismantled and transferred one by one, it is strictly forbidden to throw it at high altitude, and the formwork and concrete should not be damaged when the formwork is removed.
5. Pay attention to construction safety when the template is removed, and carry out safety protection in strict accordance with the construction safety requirements and the requirements of the template construction plan.
ZMADTO Plywood Co.Ltd is focus on construction plywood & wood formwork product. Our factory was established in 1993 and covers an area of 240,000 square meters with an average daily output of more 30,000 pcs plywood. Besides, the factory has more than 200 advanced equipment. After years of continuous development, it has become a leading company in the international wood formwork industry and exported to more than 20 countries around the world.